§ 55.070 ESTABLISHING DIFFERENCE IN COST OF SEWERS.
   Unless competitive bids are available to establish the difference in cost between eight-inch sewer systems and larger systems, the cost difference shall be taken as 125% of the difference in cost of the materials required as per annual bids to the city on such materials.
(Ord. 6619, passed 1-28-13)