§ 51.084 COMPLETION OF WORK INSPECTION REQUIRED.
   (A)   Upon completion of any new water service pipe installation or repairs, it shall be the duty of the permittee to obtain approval by the Township DPW Superintendent before covering it.
   (B)   The service trench shall not be covered, backfilled or floored until the tap has been completed and the Township DPW Superintendent has approved the installation. Clean earth or sand shall be carefully tamped every two feet above the top of the service line. This material shall be carefully and solidly compacted with proper tools. The use of clay for that purpose is prohibited.
   (C)   If any building drainage or plumbing system or part thereof which is installed, altered or repaired, is covered, it shall be uncovered for inspection after notice to the plumber, contractor, owner, or other person to uncover the work has been issued by the Township DPW Superintendent.
   (D)   A separate ball valve must be placed on the water service pipe just inside the building wall so that the water may be turned off and drained from the pipe in the event of accident or in order to make repairs. The stop shall be equal in quality to the curb stop, approved by the Township DPW Superintendent and placed before the meter. A valve immediately after the meter is also required.
(Ord. 17-02, passed 3-20-2017) Penalty, see § 51.999