CHAPTER 1354
Tree Cutting
1354.01   Intent.
1354.02   Scope.
1354.03   Permit required; master vegetation plan.
1354.04   Exceptions.
1354.05   Acceptable tree removal areas.
1354.06   Logging for economic gain prohibited.
1354.07   Plan required.
1354.08   Requirements of plan.
1354.09   Action on plan; permit issuance; site inspection; unauthorized cutting.
1354.10   Protection of trees not to be cut.
1354.11   Contractor’s license; fee; effective period.
1354.12   Permit fees; deposit.
1354.13   Appeals.
1354.99   Penalty.
CROSS REFERENCES
Destruction - see GEN. OFF. 541.06