§ 94.40 EXCAVATION PERMIT REQUIRED.
   It shall be unlawful for any person, firm or corporation to cut or excavate a street or sidewalk in the corporate limits without having first obtained a permit therefor from the town or the South Carolina Department of Highways and Public Transportation, except in a bona fide urgency situation.
('86 Code, § 15.301)
Statutory reference:
   S.C. Code § 5-7-30