§ 150.196 ADDITIONS, DELETIONS AND MODIFICATIONS OF THE STATE OF ILLINOIS PLUMBING CODE.
   The following sections of the Illinois Plumbing Code are hereby amended, deleted, or modified as hereinafter set forth:
Section Number
Section Title
Additions, Deletions and Modifications
Section Number
Section Title
Additions, Deletions and Modifications
890.110(e)
General Regulations
Add new subsection: “Plumbing and drainage systems in all buildings, public and private, shall be installed in accordance with the provisions of this ordinance by a licensed plumber in accordance with the provisions of the State of Illinois Plumbing License Law. If a plumbing contractor is found to be using unlicensed plumbers, the contractor’s plumbing permit will be revoked.”
890.110(f)
Overhead Sewers
Add new subsection: “All new buildings with basements, floors, rooms, or occupancy areas below grade shall have overhead plumbing with ejector pumps.”
Section 890
Appendix A, Table A, “Approved Materials for Building Sewers”
Amended by replacing with the following approved materials:
“a)   Cast iron, bell and spigot with compression joints
b)   Polyvinyl Chloride (PVC), SDR 26
c)   Polyvinyl Chloride (PVC) Pipe
d)   Note: Ductile iron pipe ASTM A377 shall be installed for all new sanitary and storm sewer services that penetrate the foundation wall through a sleeve to a point that the piping is being supported on approved load bearing soil or compacted fill”
Section 890
Appendix A, Table A, “Approved Materials for Water Service Pipe”
Amended by replacing with the following approved materials:
“a)   Copper/Copper Tubing – Type K only – ASTM B 88-2009
b)   Ductile Iron, Class 55 or greater”
890.610(d )
WaterSense Devices
Add new subsection: “Subject to other provisions of the Illinois Plumbing Code, 77 Ill. Admin. Code 890 et seq., and the Lawn Irrigation Contractor and Lawn Sprinkler System Registration Code, 77 Ill. Admin. Code 892 et seq., all new plumbing fixtures and irrigation controllers installed on properties after September 1, 2015, and connected to the Village water supply system shall bear the WaterSense label (as designated by the United States Environmental Protection Agency WaterSense Program), when such labeled fixtures are available.”
890.1910
Inspections
Add new subsection:
890.1910.5
Inspections Required
All plumbing work shall be subject to the inspection and approval of the Building Commissioner, the plumbing inspector under the supervision of the Building Commissioner, or any other designee of the Building Commissioner. The plumbing contractor shall be on site when the rough plumbing inspection is conducted by the Village.”
890.1960
Fees
“The fees to be charged for a permit for the installation and alteration of plumbing systems shall be established by the Board of Trustees by resolution from time to time.”
 
(Ord. 1153, passed 9-21-2015; Ord. 1241, passed 4-15-2019)