§ 150.139 PUBLIC RIGHTS-OF-WAY.
   All public rights-of-way, including streets, alleys, sidewalks and driveways crossing sidewalks, shall be maintained in a clean, safe and accessible condition. The applicant shall remove all dirt, mud, gravel and other debris generated at the site from the public rights-of-way regularly at the end of every work day, and more frequently as necessary to prevent a hazardous situation. No construction materials, including the dumpsters required under § 150.138 shall be permitted within the public rights-of-way. Sidewalks shall remain passable at all times, except for when part of the sidewalk must be removed or replaced during construction, in which case the applicant must provide an alternative clean, safe and accessible walkway. No part of the sidewalk shall be out of service for more than three days.
(Ord. 941, passed 7-11-2005)