§ 54.09 TEST METER CHARGES AND REGULATIONS ESTABLISHED.
   A fee at a rate set annually by the City Council, paid in advance, at the public utility office shall be charged to the user or users of electrical energy requesting installation of a test meter for the purpose of evaluating accuracy of an inplace meter. Accuracy shall be determined within a 5% range or actual KWH's metered by the test meter. Kasson public utilities shall replace the inplace meter should there be a variance of over five KWH low or high from actual KWH's as calibrated by the test meter.
(Prior Code, § 7-25) (Res. 1382A, passed - -; Ord. 762, passed - -)