(a) The POTW director shall evaluate whether each significant industrial user needs a plan or other action to control and prevent slug discharges defined in Section 24-102.
All SIUs must be evaluated within one year of being designated an SIU. The director may require any user to develop, submit for approval, and implement such a plan or action. Alternatively, the director may develop such a plan for any user.
(c) An accidental discharge/slug control plan shall address, at a minimum, the following:
(1) Description of discharge practices, including nonroutine batch discharges;
(2) Description of stored chemicals;
(3) Procedures for immediately notifying the director of any accidental or slug discharge, as required by section 24-196; and
(4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to:
a. Inspection and maintenance of storage areas;
b. Handling and transfer of materials;
c. Loading and unloading operations;
d. Control of plant site runoff;
e. Worker training;
f. Building of containment structures or equipment;
g. Measures for containing toxic organic pollutants, including solvents; and/or
h. Measures and equipment for emergency response.
(Ord. of 10-1-1996, § 2.8; Ord. of 12-3-2001; Amend. of 3-3-2008(3); Ord. of 3-4-2013)