Prior to the issuance of any building permit, the Building Department shall:
(A) Review all building permit applications to determine full compliance with the provisions of this subchapter;
(B) Review all building permit applications for new construction or substantial improvements to determine whether proposed building sites will be reasonably safe from flooding;
(C) Review building permit applications for major repairs within the floodplain area having special flood hazards to determine that the proposed repair:
(1) Uses construction materials and utility equipment that are resistant to flood damage; and
(2) Uses construction methods and practices that will minimize flood damage;
(D) Review building permit applications for new construction or substantial improvements within the floodplain having special flood hazards to assure that the proposed construction (including prefabricated and mobile homes):
(1) Is protected against flood damage;
(2) Is designated (or modified) and anchored to prevent flotation, collapse or lateral movement or the structure and flood damage; and
(3) Uses construction methods and practices that will minimize flood damage.
(Ord. 08, 2008, passed 6-23-2008) Penalty, see § 150.99