(A) No permit shall be issued nor shall any work requiring a permit begin until the fees hereinafter have been issued to the village and received by the Building Department.
(B) Nothing in this section or schedule of fees shall be construed to affect any suit or proceeding pending in any court, or any rights acquired, or liability incurred, or any cause or causes of action a required or existing, under any act or ordinance hereby repealed, nor shall any just or legal right of remedy or any character be lost, impaired or affected by this section.
(C) The fees to be paid for permits, and that the cash bonds or surety bonds to be collected for projects under the jurisdiction of the village shall be amended, and shall be as follows:
TABLE I
FEES FOR SINGLE-FAMILY RESIDENCES, INCLUDING TOWNHOUSES
FEES FOR SINGLE-FAMILY RESIDENCES, INCLUDING TOWNHOUSES
Permit type | Fee
($) | Specification |
Permit type | Fee
($) | Specification |
Permit Processing Fee | 30 | Permit processing base fee |
Water connection | 900 | Each detached dwelling unit |
1,000 | Each detached dwelling unit | |
Sewer connection | 1,400 | Each detached dwelling unit |
1,600 | Each detached dwelling unit | |
Water meter | 250 | 3/4 inch with remote - 135 GPM |
300 | 1 inch with remote - 215 GPM | |
450 | 11/2 inch with remote | |
Unmetered water | 60 | For limited use (new buildings) |
New construction of single-family detached principal buildings or additions to existing buildings | 500 Base fee + 0.90 | Per gross square feet above grade, excluding area of wood decks, terraces, open porches and the like. This includes fees for electric, plumbing, HVAC work and the like. |
New construction of townhouse principal buildings or additions to existing buildings | 700 Base fee + 1.25 | Per gross square feet above grade, excluding area of wood decks, terraces, open porches and the like. This includes fees for electric, plumbing, HVAC work and the like. |
Remodel/alter existing principal building or new attached garage | 100 Base fee + 0.50 | Per gross square feet above ground, excluding wood decks. This includes fees for electric, plumbing, HVAC work and the like. |
New construction of accessory buildings and detached garages | 50 Base fee + 0.30 | Per gross square feet above grade, excluding area of wood decks, terraces, open porches and the like. This includes fees for electric, plumbing, HVAC work and the like. |
Remodeling of accessory buildings and detached garages/porches with roofs | 30 Base fee + 0.30 | Per gross square feet above grade, excluding area of wood decks, terraces, open porches and the like. This includes fees for electric, plumbing, HVAC work and the like. |
Public
Sidewalks/curbs | 250 | New installation, replacement or repair |
Decks/porches | 300 | New construction or repair |
Driveways | 75 | New construction |
400 | Replacement or repair | |
Curb cut fees | 75 | Per curb cut, driveway, sidewalk |
Street cut fees | 500 | To open cut a street (plus road bond) |
Private sidewalks and patios | 300 | New installation, replacement or repair |
Swimming pools | 700 | In-ground |
450 | Above-ground | |
Furnace, central AC HVAC systems | 250 | New system, replace existing unit |
Miscellaneous plumbing and piping | 50 | For the first 4 fixtures, openings, cleanouts and the like |
12 | For each additional fixture, opening, cleanout and the like over 4 | |
Lawn sprinkler | 50 | For each system or per lot |
Electric service | 30 | Up to 200 amps |
25 | Temporary service | |
Electric miscellaneous | 30 | When not included in above cost |
Alarm systems | 40 | For burglar or fire alarms |
Fences | 250 | |
Roofs | 225 | When replacing existing or covering existing |
Siding | 250 | |
Hydronic heating systems | 250 | Each system |
Drainage revision | 50 | Minimum, plus consultant's fee at cost |
Sheds | 300 | |
Signs non-illuminated | 40 | Non-illuminated minimum |
2 | Per square foot of face | |
Signs Illuminated | 60 | Illuminated minimum |
3 | Per square foot of face | |
Signs Temporary | 50 | Per sign |
Miscellaneous inspections | 150 | Per hour |
Late filing charge | 75 or 2% cost of job | Minimum for work begun without a valid permit (whichever is greater) |
Canceled projects | 150 | Per hour, per inspector |
Reinspections | 75 | For each reinspection |
Chimneys | 50 | For new or reconstruction if not part of the base permit fee |
Fireplaces | 75 | Prefab or masonry |
Engineering | At cost | Reimburse the village for costs incurred for engineering consultants. May be billed after permit is issued. No final occupancy will be issued until invoice is paid |
Demolition | 250 | Partial building or structure |
750 | Entire building or structure | |
Electric | 5,000 | Code compliance bond to be maintained until job is completed and approved |
Cash bonds | 50 | Minor work - to ensure inspection code compliance and for damage to property |
100 | Moderate work - to ensure inspection code compliance and for damage to property | |
500 | Intermediate work - to ensure inspection code compliance and for damage to property | |
1,000 | Dwelling units - to ensure inspection code compliance and for damage to property | |
½ % | Of the cost of the job when required by the Building Commissioner | |
Road bonds | 350 | Per dwelling unit, for projects over $10,000, using village roads rated less than 80,000 pounds with material loads over 15,000 pounds per truck, for the protection of village pavement. |
Road use fees | 150 | Per dwelling unit, for projects over $10,000, using village roads rated less than 80,000 pounds with material loads over 15,000 pounds per truck, as a predetermined fair share cost for road repairs necessitated by heavily loaded trucks |
Electronic pet containment | 110 | Per system installation |
Portable storage container | 110 | Per container |
Plan review | 10% of total buildin g permit fee | Review fee for all new construction, additions, and alterations |
Residential generator | 250 | Per system |
Final Certificate of Occupancy | 50 | Final (remodel or addition) |
100 | Final (new construction) | |
Conditional Certificate of Occupancy (not required for work limited by weather) | 75 | Conditional (remodel or addition) |
250 | Conditional (new construction) | |
Permit deposit | 500 | Must be deposited with permit application. Deposit will be applied towards the cost of the building permit when issued. |
TABLE II
FEES FOR MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, OFFICE, INSTITUTIONAL AND ALL OTHER CONSTRUCTION NOT LISTED IN TABLES I OR III
FEES FOR MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, OFFICE, INSTITUTIONAL AND ALL OTHER CONSTRUCTION NOT LISTED IN TABLES I OR III
Permit type | Fee
($) | Specification |
Water connection - multiple dwelling | 1,000 | Each dwelling unit |
Sewer connection - multiple dwelling | 1,600 | Each dwelling unit |
Water connection - commercial, industrial, institutional, hotels, offices and the like | 1,500 + 0.15 | For each new building plus per gross square feet over 5,000 square feet for new buildings or additional area to existing buildings |
Sewer connection - commercial, industrial, institutional, hotels, offices and the like | 2,500 + 0.25 | For each new building plus per gross square feet over 5,000 square feet for new buildings or additional area to existing buildings |
Permit type | Fee
($) | Specification |
Permit type | Fee
($) | Specification |
Miscellaneous connection fees | Fair charge | For those situations not covered in any of the 4 previous classifications or where unusual water or sewer problems are encountered, the Board of Trustees shall establish a fair and reasonable charge, consistent with the nature of the situation and problem, and charges hereinabove made |
Base permit fees (new buildings and additions) | 190 | Minimum |
0.60 | Per square foot (buildings) | |
Base fees for alterations and repairs | 95 | Minimum |
20 | Per $1,000 cost of job | |
Plan review | 10% of cost of building permit fee | Review fee for all new construction, additions, and alterations |
Shoring or moving building | 100 | Minimum |
0.10 | Per square foot | |
Wrecking building | 100 | Minimum (per floor) |
0.07 | Per square foot | |
1,500 | Minimum (entire building) | |
Elevators, each | 150 | Annual Code inspection, reinspection, 5 floors or less |
25 | Administrative fee per Code inspection, reinspection | |
25 | Each additional floor above 5 | |
150 | Temporary construction towers | |
25 | Administrative fee for temporary construction towers | |
100 | New permit inspection, reinspection | |
100 | Plan review | |
25 | Elevator certificate | |
Ventilation systems | 60 | Minimum for first 3,000 CFM |
15 | For each additional 1,000 CFM | |
Furnaces | 250 | New system, replace existing unit |
AC units | 250 | New system, replace existing unit |
Permit type | Fee
($) | Specification |
Permit type | Fee
($) | Specification |
Boilers | 250 | Each unit |
Fences | 240 | For the first 100 lineal feet |
10 | For each additional 100 lineal feet or part thereof | |
Final Certificate of Occupancy | 100 | Final (remodel/addition) |
200 | Final (new construction) | |
Conditional Certificate of Occupancy (not required for work limited by weather) | 400 | Conditional (remodel/addition) |
500 | Conditional (new construction) | |
200 | Conditional (Zoning Certificate only) | |
Tank installation | 150 | 121 - 1,000 gallons each tank |
6 | Each additional 1,000 gallons per tank | |
Tank removal | 70 | Each tank |
Temporary platforms | 75 | For public assembly |
Roofing | 225 | Minimum |
0.02 | Per square foot | |
Signs non-illuminated | 40 | Non-illuminated minimum |
2 | Per square foot of face | |
Signs illuminated | 60 | Illuminated minimum |
3 | Per square foot of face | |
Signs temporary | 50 | Per sign |
Permit type | Fee
($) | Specification |
Permit type | Fee
($) | Specification |
Plumbing and piping | 75 | Minimum for the first 5 new fixtures, openings, cleanouts and the like |
10 | For each additional new fixture, opening, cleanout and the like in excess of 5 | |
60 | Minimum for first 5 replaced | |
10 | For each additional replaced fixture, opening, cleanout and the like in excess of 5 | |
Water meters | 150 | 3/4 inch with remote - straight |
200 | 1 inch with remote - straight | |
400 | 1 1/2 inch with remote - straight | |
750 | 2 inch with remote - straight | |
1,600 | 2 inch with remote - compound | |
2,000 | 3 inch with remote - compound | |
3,300 | 4 inch with remote - compound | |
6,000 | 6 inch with remote - compound | |
Fire review | 100 | Base fee + Fire District costs |
Sprinkler field inspections | 100 | Base fee + Fire District costs |
Fire pumps | 150 | Each pump |
Hydrostatic | 75 | Each test |
Fire Alarm Plan review | 100 | Per hour |
Base fee + Fire District costs | ||
Restaurant kitchen hoods, ducts and Extinguishing Systems Plan review | 80 | Per hour |
Permit type | Fee
($) | Specification |
Permit type | Fee
($) | Specification |
Electrical | 50 | Minimum fee |
30 | Plan review per hour | |
8 | Per 20 amp or less circuit, up to 50 circuits | |
5 | Per 20 amp or less circuit, over 50 circuits | |
16 | Per 21 - 50 amp circuit | |
1 | For each additional outlet or device on an existing circuit | |
15 | One motor or device | |
7.50 | Each additional motor or device | |
Electrical services | 40 | 0 - 100 amps |
50 | 101 - 200 amps | |
55 | 201 - 400 amps | |
60 | 401 - 600 amps | |
75 | 601 - 1,000 amps | |
Note: Fees for electrical services in excess of 1,000 amps shall be computed on the basis of the rating of the service disconnects installed, prorated according to the fee schedule and shall include feeders, risers and all wiring equipment up to the branch circuit distribution panels or motor power panels or control centers. | ||
Vault inspections | 50 | Each vault (except utility vaults) |
Lamp posts | 25 | Each pole |
Fire alarms | 60 | Minimum |
15 | Per 1,000 cost of job | |
Burglar alarms | 60 | Per system or tenant space |
Communications | 50 | Per floor minimum |
15 | Per 1,000 cost of job | |
Video/antennas | 50 | Per system |
Swimming pools | 150 | Each pool |
Permit type | Fee
($) | Specification |
Permit type | Fee
($) | Specification |
Driveways | 500 | Each driveway |
75 | Each curb cut | |
Parking lot restripe or repave | 0.50 | Per space |
New parking lot | 2 | Per space |
Roadways, private | 2 | Per lineal foot |
Sidewalks, curbs | 250 | For first 100 lineal feet |
10 | For each additional 100 lineal feet or part thereof | |
Loading docks | 40 | Each dock |
Compactors | 50 | Each compactor |
Hydrant flushing | 150 | Per 1,000 feet of main or part thereof |
Fire pump tests | 150 | Per test |
New water main tests | 150 | Per test |
Water main chlorination | 150 | Per chlorination |
Unmetered water | 50 | For limited use (new building) |
Canceled projects | 150 | Per cancelled permit + cost per hour ($150) for plan review completed |
Engineering | Costs incurred | Per consultant invoices. May be billed after permit is issued. No final occupancy will be issued until invoice is paid. |
Civil improvements | 200 | For Village Employee review |
New tenant inspections | 100 | For occupancy up to 10,000 square feet |
50 | For each 10,000 square feet thereafter | |
Reinspections | 150 | Per hour |
Other fees | As required | Per Subdivision Regulations and/or Development Standards |
Antennas, flagpoles | 50 | Each |
Canopies | 60 | Each canopy |
Permit type | Fee
($) | Specification |
Permit type | Fee
($) | Specification |
Chimneys | 50 | Isolated chimney over 20 feet above any roof |
Not listed above | 1 ½% | Of the actual cost for work which requires a permit |
Late filing charge | 75 or 2% of job cost | For work begun without a permit (whichever is greater) |
Land Development Permit fee | 1,500 or 7 ½% | Of the cost of land improvements less mass grading and buildings minimum for Land Development Permit fee (2 ½% plan review, 5% construction inspections) |
Curb cut fees | 75 | Per curb cut, driveway, sidewalk |
Street cut fees | 500 | To open cut a street (plus road bond) |
TV inspections of sewer mains - bond fee | 1.50 | Per lineal foot. To be refunded upon compliance with Development Standards, or shall be used by the village to complete said requirements. |
Soil erosion control bond | 1,500 | Per acre or part thereof for projects involving site grading. This may be included as part of the code performance bond. |
Electrical bond | 5,000 | Code compliance bond to be maintained until job is completed and approved |
Cash bonds | 50 | Minor work to ensure inspections, code compliance and for damage to property |
250 | Moderate work to ensure inspections, code compliance and for damage to property | |
500 | Intermediate work to ensure inspections, code compliance and for damage to property | |
750 | Substantial work to ensure inspections, code compliance and for damage to property, for projects up to $150,000 value | |
½% | One-half percent of the cost of the job when required by the Building Commissioner | |
Permit type | Fee
($) | Specification |
Road bonds | 350 | Per unit or building for projects over $10,000 using village roads rated less than 80,000 pounds capacity with material loads over 15,000 per truck for the damage of the roads |
Road use fees | 150 | Per unit or building for projects over $10,000 using village roads rated less than 80,000 pounds capacity with material loads over 15,000 per truck as a predetermined cost for road repairs necessitated by heavily loaded trucks. |
Permit deposit | 1,000 | Must be deposited with permit application. Deposit will be applied towards the cost of the building permit when issued. |
TABLE III
FEES FOR NOT-FOR-PROFIT ORGANIZATIONS
FEES FOR NOT-FOR-PROFIT ORGANIZATIONS
Permit type | Fee ($) | Specification |
Permit type | Fee ($) | Specification |
Not-for-profit organizations | Fees waived | Except as listed below, for permits issued to "not-for-profit organizations," including the Village of Itasca, Park Districts, other governmental organizations, schools, churches and other not-for-profit groups approved by the President of the Board of Trustees (excludes any and all outside consultant costs incurred by the village) |
Engineering | Costs incurred | Per consultant invoices. May be billed after permit is issued. No final occupancy will be issued until invoice is paid. |
Soil Erosion Control Board | 1,500 | Per acre of part thereof for projects involving site grading. This may be included as part of the code performance bond. |
Electrical bond | 5,000 | Code compliance bond to be maintained until job is completed and approved. |
Cash bonds | 50 | Minor work to ensure inspections, code compliance and for damage to property |
250 | Moderate work to ensure inspections, code compliance and for damage to property | |
500 | Intermediate work to ensure inspections, code compliance and for damage to property | |
750 | Substantial work to ensure inspections, code compliance and for damage to property, for projects up to $150,000 value | |
½% | One-half percent of the cost of the job when required by the Building Commissioner | |
Road bonds | 350 | Per unit or building for projects over $10,000 using village roads rated less than 80,000 pounds capacity with material loads over 15,000 per truck for the damage of the roads |
Road use fees | 150 | Per unit or building for projects over $10,000 using village roads rated less than 80,000 pounds capacity with material loads over 15,000 per truck as a predetermined cost for road repairs necessitated by heavily loaded trucks. |
Late filing charge | 75 | For work begun without a permit |
Water meters | - - | See page 40G for fees |
Water usage | - - | See Ch. 52 for fees |
Land Development Permit Fees | - - | See page 40J for fees |
TABLE IV
FEES FOR SMALL WIRELESS FACILITIES
FEES FOR SMALL WIRELESS FACILITIES
Permit type
| Fee ($) |
Specification
|
Application | 650 | To collocate a single small wireless facility on an existing utility poll or wireless support structure |
Application | 350 | For each small wireless facility addressed in an application, to collocate more than one small wireless facility on existing utility poles or wireless support structures |
Application | 1,000 | For each small wireless facility addressed in any application that includes the installation of a new utility for such collocation |
Annual | 200 or the actual, direct, and reasonable costs |
(Ord. 713-91, passed 5-14-91; Am. Ord. 754-93, passed 1-26-93; Am. Ord. 851-95, passed 11-21-95; Am. Ord. 1080-01, passed 3-20-01; Am. Ord. 1346-06, passed 12-19-06; Am. Ord. 1438-08, passed 5-20-08; Am. Ord. 1462-08, passed 11-4-08; Am. Ord. 1818-16, passed 10-4-16; Am. Ord. 1887-18, passed 7-24-18; Am. Ord. 2006-22, passed 2-1-22; Am. Ord. 2056-23, passed 3-7-23) Penalty, see § 150.99