1020.13 SHORING OF EXCAVATIONS.
   All openings and excavations shall be properly and substantially sheeted and braced as a safeguard to workmen and to prevent cave-ins or washouts which would tend to injure the thoroughfare or sub-surface structure of the street.
(Ord 362. Passed 3-1-94.)