(A) The permit fee for each refrigeration permit shall normally include no more than one rough inspection and/or one final inspection. All additional inspections necessitated by the work not being ready or not being properly completed at the time inspection was called for, all reinspection of violation corrections, all inspections of repairs and/or alterations not covered in the permit fee schedules, all overtime inspections, all special inspections not otherwise provided for, and all extra inspections made at the request of the owner or the contractor shall be charged for as specified in § 151.005.
(B) The fee for special or shop inspections of refrigeration equipment, each unit, each visit, shall be $75.
(‘68 Code, § 6-2349) (Ord. 646, passed 2-2-87)