Installation Permits | Fees |
Installation Permits | Fees |
Unfired pressure vessels: | |
Unfired pressure vessels (not heated), each | $40 |
Unfired pressure vessels (heated by steam or other media), each | 40 |
Major repairs to existing pressure vessels, each | 40 |
Anhydrous ammonia storage equipment: | |
Systems using I.C.C. cylinders, each system: | |
5 cylinders or less | 20 |
6 to 10 | 25 |
11 to 15 | 40 |
16 or more | 55 |
Systems using A.S.M.E. containers, each system: | |
1,000 pounds capacity or less | 25 |
1,001 to 2,500 pounds | 40 |
2,501 to 5,000 pounds | 55 |
Over 5,000 pounds | 60 |
Vehicles transporting anhydrous ammonia cargoes in A.S.M.E. containers: | |
Each vehicle | 55 |
Boilers: | |
Boilers up to and including 1,000 square feet of heating surface | 40 |
Boilers over 1,000 square feet of heating surface | 40 |
Plus $5 for each 1,000 square feet of heating surface. | |
(No license required for low pressure boilers not exceeding 300 square feet of heating surface.) | |
Alteration permit | 40 |
Hazardous gases - storage: | |
Chlorine, sulphur dioxide and methyl chloride: | |
Total quantity on premises: | |
500 pounds or less | 28 |
Over 500 pounds to 1 ton | 35 |
Over 1 ton to 15 tons | 47 |
Over 15 tons | 80 |
Other hazardous gases, systems with connected containers: | |
Hospitals: | |
20 outlets or less | 45 |
21 to 30 outlets | 55 |
Over 30 outlets | 80 |
Occupancies other than hospitals: | |
2,500 cubic feet or less | 30 |
2,501 to 5,000 cubic feet | 35 |
5,001 to 10,000 cubic feet | 47 |
Over 10,000 cubic feet | 80 |
Other hazardous gases, total storage on premises, not connected to a system or appliance: | |
2,500 cubic feet or less | 28 |
Over 2,500 to 5,000 cubic feet | 35 |
Over 5,000 to 10,000 cubic feet | 48 |
Over 10,000 cubic feet | 80 |
(‘68 Code, § 6-2322) (Ord. 646, passed 2-2-87)