§ 156.029 PLAN PREPARATION AND CONTENT.
   (A)   Concept EPSC plans.
      (1)   Applicability. A concept EPSC plan, submitted by a qualified plan preparer, shall be required for all land use applications subject to a Type I review procedure.
      (2)   Contents. The concept EPSC plan shall contain the information and data as set forth in the MSD Design Manual, Standard Specifications, and Standard Drawings, including a narrative.
      (3)   Plan preparers.
         (a)   Detailed EPSC plans for land disturbing activities subject to Type I review. A detailed EPSC plan subject to Type I review shall be prepared and certified by a qualified plan preparer. In addition, the MSD may require consultation with geologists, hydrologists, soil scientists, and other professionals, as the MSD deems appropriate.
         (b)   Detailed EPSC plans for land disturbing activities subject to Type II review. Unless determined otherwise by the MSD, a detailed EPSC plan subject to Type II review shall be prepared and certified by a qualified plan preparer. Such determination will be based upon the amount of site disturbed, the type of disturbance and the proximity to drainageways.
(Ord. 26, passed 9-25-2001)