§ 51.23 MEASUREMENTS, TESTS AND REPORTS.
   The city shall cause to be determined the daily volume of flow in the Belle River upstream from the point of discharge of process wastes, shall cause to be performed measurements and tests of the waste discharges into the Belle River, and shall cause to be maintained records of operation of waste control facilities provided in accordance with this subchapter to the extent necessary to demonstrate compliance with the requirements of § 51.22. Reports of such measurements, tests, and operations shall be filed by the city with the Chief Engineer of SWRC and the City Manager at the end of each calendar month.
(Ord. 12.3, passed 2-4-64)