§ 90.17 INSTALLATION REQUIREMENTS.
   (A)   Standards for installation. The excavation, backfilling, patching and restoration, and all other work performed in the right-of-way shall be done in conformance with Minnesota Rules 7819.1100 and 7819.5000 and other applicable local requirements, in so far as they are not inconsistent with the M.S. §§ 237.162 and 237.163. Installation of service laterals shall be performed in accordance with Minnesota Rules Ch. 7560 and these ordinances. Service lateral installation is further subject to those requirements and conditions set forth by the city in the applicable permits and/or agreements referenced in § 90.23(B).
   (B)   Requirement of sewer and water laterals. No petition for the improvement of a street shall be considered by the Council if the petition contemplates constructing therein any part of a pavement or stabilized base, or curb and gutter, unless all sewer and water main installations shall have been made therein, including the installation of service laterals to the curb, if the area along the street will be served by those utilities installed in the street.
   (C)   Sewer system service and water main service laterals. No sewer system shall be hereafter constructed or extended unless service laterals to platted lots and frontage facing thereon shall be extended simultaneously with construction of mains.
   (D)   Waiver. The Council may waive the requirements of this section only if it finds the effects thereof are burdensome and upon notice and hearing as the Council may deem necessary or proper.
(Ord. 18-0783, passed 6-26-2018; Ord. 19-796, passed 3-26-2019)