1139.02 BOARD OF BUILDING AND ZONING APPEALS.
   (a)    Appointment. There is hereby created a Board of Building and Zoning Appeals consisting of five members who shall be residents who hold no other City office or employment, selected by Council, one each year for overlapping terms of five years. It shall have all the power and authority conferred upon boards of zoning appeals by state law and such other duties as may be imposed upon it by state law. Its members shall serve without compensation.
   (b)   Procedure. The Board shall adopt its own rules, in accordance with this chapter and elect its own officers annually. Meetings of the Board shall be held at the call of the Chairman and at such other times as the Board may determine.
   The Chairman, or in his absence, the Acting Chairman, may administer oaths and the Board may compel the attendance of witnesses. All meetings of the Board shall be open to the public. The Board shall keep minutes of its proceedings, showing the vote of each member upon each question or, if absent or failing to vote, indicating such fact, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the office of the Board and shall be a public record.
   (c)   Quorum. Three members of the Board shall constitute a quorum. The Board shall act by resolution; and the concurring vote of three members of the Board shall be necessary to reverse any order, requirement, decision or determination of the Building Official or any other duly authorized administrative officer, or to decide in favor of an applicant in any matter on which it is required to pass under this Zoning Ordinance, of every such determination shall be stated. A member of the Board shall not be qualified to vote if he has not attended the public hearing or if he has a direct or indirect interest in the issue appealed.
   (d)   Assistance; Other Departments. The Board may call upon the City departments for assistance in the performance of its duties, and such departments shall render such assistance to the Board as may reasonably be required.
   (e)   Applications, Appeals, Hearings and Stay of Proceedings. An application in cases in which the Board has original jurisdiction under the provisions of this chapter, may be taken by any property owner, including a tenant, or by a governmental officer, department, board or bureau. Such application shall be filed with the Zoning Inspector, who shall transmit same to the Board. An appeal to the Board may be taken by any person aggrieved or by any officer, department, board or bureau of the City affected by any decision of the Zoning Inspector. Such appeal shall be taken within thirty days after the decision, by filing with the secretary of the Board a notice of appeal specifying the grounds thereof. The Zoning Inspector shall forthwith transmit to the Board all the papers constituting the record upon which the action appealed from was taken.
   If an application or appeal is received at least five days before a regularly scheduled meeting of the Board, it shall act within forty-five days after such meeting. Failure to act within such period shall be considered approval. Before making any decisions on an application or appeal, the Board shall hold a public hearing at such times as shall be determined by the Board itself. Special hearings can be arranged at the call of the Chairman. Notices of the time and place of hearings shall be mailed, by regular first-class mail, not less than three days prior to the date of the hearing, to the appellant and to affected property owners owning property located within 100 feet of the property that is the subject of the application or appeal, as the names of such owners appear in the current records of the County Auditor's office, or such notice may be given by publication for two successive weeks prior thereto in a newspaper of general circulation in the City.
   Failure to notify any affected property owner, as hereinbefore defined, shall have no effect upon the validity of the proceedings taken by the Board. Each application or appeal shall be accompanied by a fee as prescribed by Council in Section 1321.12 of the Building Code to cover the cost of publishing and/or posting and mailing the notices of the hearing or hearings. At the hearing, any party may appear in person or be represented by an agent or attorney.
   Any person or persons, jointly or severally aggrieved by the decision of the Board, may appeal to the Court of Common Pleas that such decision is unreasonable or unlawful. Such petition shall be presented to the Court within thirty days after the filing of the decision in the office of the Board.
   A certified copy of the Board's decision shall be transmitted to the applicant or appellant, and to the Zoning Inspector. Such decision shall be binding upon the Zoning Inspector and observed by him, and he shall incorporate the terms and conditions of the same in the permit to
the applicant or appellant, whenever a permit is authorized by the Board.
   A decision of the Board shall not become final until the expiration of five days from the date such decision is made, unless the Board finds the immediate taking of effect of such decision is necessary for the preservation of property or personal rights and shall so certify on the record.
   An appeal shall stay all proceedings in furtherance of the action appealed from, unless the Zoning Inspector certifies to the Board after notice of appeal is filed with him, that by reason of acts stated in the certificate, a stay would, in his opinion, cause imminent peril to life or property. In such case, proceedings shall not be stayed otherwise than by a restraining order which may be granted by the Board or by the Court of Common Pleas on application, on notice to the Zoning Inspector, or by judicial proceedings and on due cause shown.
   (f)   Powers. The Board of Building and Zoning Appeals shall have the following powers:
   The Board shall have the power to hear and decide, in accordance with the provisions of this chapter, applications, filed as hereinbefore provided, for conditional uses, special exceptions or for interpretation of the Zoning Map, or for decision upon other special questions on which the Board is authorized by this Ordinance to pass. In considering an application for a conditional use, a special exception or interpretation of the Zoning Map, the Board shall give due regard to the nature and conditions of all adjacent uses and structures; and in authorizing a conditional use or special exception, the Board may impose such requirements and conditions with respect to location, construction, maintenance and operation, in addition to those expressly stipulated in this chapter for the particular conditional use or special exception, as the Board may deem necessary for the protection of adjacent properties and the public interest.
   In addition to permitting the conditional uses and special exceptions hereinbefore specified, the Board shall have the power to permit the following conditional uses and special exceptions:
      (1)   Nonconforming uses; substitution. The substitution of a nonconforming use existing at the time of enactment of this chapter by another nonconforming use, if no structural alterations except those required by law or resolution are made, provided however, that in an R District, no change shall be authorized by the Board to any use which is not a permitted or conditional use in any R District and in a B District, no change shall be authorized to any use which is not a permitted or conditional use in any B District.
      (2)    Nonconforming uses; extension. The extension of a nonconforming building upon the lot occupied by such building or on an adjoining lot, provided that such lot was under the same ownership as the lot in question at the time the use of such building became a nonconforming use, that the value of such extension shall not exceed in all twenty-five percent (25%) of the assessed valuation for tax purposes of the existing building devoted to a nonconforming use, that such extension shall be within a distance of not more than fifty feet of the existing building or premises, that such extension shall in any case by undertaken within five years of the enactment of this chapter; and provided further however, that the Board shall not authorize any extension or enlargement which would result in violation of the provisions of this chapter with respect to any adjoining premises.
      (3)    Extension of use on border of district. The extension of a use or building into a more restricted district immediately adjacent thereto, but not more than twenty-five feet beyond the dividing line of the two districts, under such conditions as will safeguard development in the more restricted district.
      (4)    Conditional industrial uses. Permitted in the I-1 and I-2 Districts, certain of the industries or uses listed in Sections 1125.04 and 1125.05 as conditionally permitted. In doing so, the Board may require the installation, operation and maintenance in connection with the proposed use, of such devices or such methods of operation, as may in the opinion of the Board be reasonably required to prevent or reduce fumes, gas, dust, smoke, odor, water-carried waste, noise, vibration or similar objectionable features, and may further impose such conditions regarding the extent of open spaces between such industries or uses and surrounding properties, where such distance is not specifically indicated, as will tend to prevent or reduce the harm which might otherwise result from the proposed use of surrounding properties and neighborhoods.
      (5)    Temporary structures and uses. The temporary use of a structure or premises in any district for a purpose or use that does not conform to the regulations prescribed elsewhere in this chapter for the district in which it is located, provided that such use is of a temporary nature and does not involve the erection of a substantial structure. A zoning certificate for such use shall be granted in the form of a temporary and revocable permit for not more than a twelve-month period, subject to such conditions as will safeguard the public health, safety, convenience and general welfare.
      (6)    Conditional uses: wind energy conversion systems.
         A.    Purpose. The purpose of subsection (f)(6) hereof is to preserve and protect the public health and safety and to promote the orderly land use and development in the City of Huron by the implementation of standards and procedures by which the installation and operation of Wind Energy Conversion Systems (WECS) (wind turbines) shall be governed as a conditional use in any zoning district of the City.
         B.    Definitions.
            1.    A wind energy conversion system (WECS) includes any or all of the following components.
               a.    A turbine with propeller type blades;
               b.    A vertical rotor;
               c.    Other means of capturing the energy of the moving air;
               d.    A tower or a mounting structure;
               e.    An electrical power generator with associated electrical power transmission circuitry;
               f.    A battery or other means of storing energy;
               g.    Other means of transmitting energy (hydraulic, mechanical, etc.);
               h.    Mechanical control mechanisms;
               i.    Electrical/electronic/computer circuitry;
               j.    A foundation;
               k.    Enclosures.
            2.    Total height means the distance measured from ground level to the blade extended at its highest point or to the top of the tower, whichever is the highest.
            3.    Small wind energy conversion system means a wind energy conversion system consisting of a wind turbine, a tower, and associated control or conversion electronics, which will be used primarily to reduce on-site consumption of electrical power.
            4.    Windmill rotor means that portion of the windmill which includes the blades, hub and shaft.
            5.    Windmill tower means the supporting structure on which the rotor, turbine and accessory equipment are mounted.
            6.    Commercial wind energy conversion system means a wind energy conversion system consisting of more than one wind turbine and tower, and a wind energy conversion system which will be used primarily for off-site consumption of electrical power.
            7.    Wind turbine means a wind energy conversion system which converts wind energy into electricity through the use of a wind turbine generator or rotor; and includes the turbine, rotor, blade, tower, base and pad transformer (if any) in addition to the wind energy conversion systems designed to mount directly on the roof of existing buildings including residences.
            8.    Applicant means the person or entity filing an application for a conditional use permit under this subsection (f)(6).
         C.    Applicability.
            1.    This subsection is applicable to all Wind Energy Conversion Systems (WECS), small and commercial; and Wind Turbines as defined in this section which are proposed to be constructed or located after the effective date of this section.
            2.    Wind Energy Conversion Systems and Wind Turbines constructed or located prior to the effective date of this subsection shall not be required to meet the provisions of this subsection provided that any physical modification to such pre-existing Wind Energy Conversion System (WECS) or Wind Turbine that materially alters the size, type and number of any such WECS or Wind Turbine shall require compliance with this subsection. If any preexisting WECS or Wind Turbine is destroyed or damaged to the extent of more than 50 percent of its fair market value at the time of destruction or damage, it shall not be reconstructed except in conformity with this section.
         D.    Permit requirement.
            1.    No Wind Energy Conversion System, small or commercial, or Wind Turbine shall be constructed or located within the City of Huron unless a conditional use permit has been issued to the applicant.
            2.    The conditional use permit application shall be made in compliance with this subsection and be accompanied with a fee for appearances before the Board of Building and Zoning Appeals.
            3.    Any physical modification to an existing and permitted Wind Energy Conversion System or Wind Turbine that materially alters the size, type and number of such WECS shall require a permit modification under this subsection. Like-kind replacements shall not require a permit modification.
            4.    An applicant who proposes to construct or locate a Wind Turbine, as defined in this subsection, on the roof of an existing structure shall be required to apply for a conditional use permit and request a variance from the Board of Building and Zoning Appeals.
         E.    Small Wind Energy Conversion System Requirements.
            1.    Permitted locations. A small wind energy conversion system is permitted in any zoning district.
            2.    Setbacks.
               a.    Property lines. A small wind energy conversion system or tower shall be set back from the nearest property line, public road right-of-way and communication and electrical line not less than 1.0 times its total height.
            3.    Design standards.
               a.    Monopole or freestanding design. The design of the small wind energy conversion system or tower shall be of a monopole or freestanding design without guy wires.
               b.    Minimum blade height. The minimum height of the lowest extent of a turbine blade shall be 30 feet above the ground or 30 feet above any structure or obstacle within 50 feet of the tower.
               c.    Access. No tower shall have a climbing apparatus within 15 feet of the ground. All access doors or access ways to towers and electrical equipment shall be able to be locked.
               d.    Noise. No small wind energy conversion system shall generate sounds exceeding 60 dBA as measured at 100 feet from the tower. Noise generated from any small WECS shall also comply with existing City noise ordinance.
               e.    Visual appearance. Small wind energy conversion or tower systems shall be finished in a rust-resistant, non-obtrusive finish and color that is non-reflective. No small wind energy conversion system or tower shall be lighted unless required by the FAA. No flags, streamers, decorations, advertising signs of any kind or nature whatsoever shall be permitted on any small wind energy conversion system and/or tower.
               f.    Electrical interconnections. All electrical interconnection or distribution lines shall be underground and comply with all applicable codes and public utility requirements.
               g.    Signal interference. Efforts shall be made to site small wind energy conversion systems, or towers, to reduce that likelihood of blocking or reflecting television and other communication signals. If signal interference occurs, both the small wind energy conversion system or tower owner and individual receiving interference shall make reasonable efforts to resolve the problem. No small wind energy conversion system or tower shall cause permanent and material interference with television or other communication signals.
         F.    Permit applications. Application for a small wind energy conversion system and/or tower shall include the following information:
            1.    Site plan to scale showing the location of the proposed small wind energy conversion system and/or tower and the locations of all existing buildings, structures and property lines, along with distances; and,
            2.    Elevations of the site to scale showing the height, design and configuration of the small wind energy conversion system and the height and distance to all existing structures, buildings, electrical lines and property lines; and
            3.    Standard drawings and an engineering analysis of the systems tower, including weight capacity; and,
            4.    A standard foundation and anchor design along with soil conditions and specifications for the soil conditions at the site; and,
            5.    Specific information on the type, size, rotor material, rated power output, performance, safety and noise characteristics of the system; including, the name and address of the manufacturer, model and serial number; and,
            6.    Emergency and normal shutdown procedures; and,
            7.    A line drawing of the electrical components of the system in sufficient detail to establish that the installation conforms to all applicable electrical codes; and,
            8.    Evidence that the provider of electrical service of the property has been notified of the intent to install an interconnected electricity generator; unless, the system will not be connected to the electricity grid.
         G.    Commercial wind energy conversion system requirements.
            1.    Permissible locations. A commercial wind energy conversion system may be permitted as a conditional use (special exception) in all commercial and/or Industrial Districts.
            2.    Setbacks.
               a.    Property lines. A commercial wind energy conversion system shall be set back from the nearest property line and public road right-of-way not less than 1.0 times the total height of installation.
               b.    Other uses. No commercial wind energy conversion system shall be located within 1,000 feet of a platted subdivision, park, church, school or playground.
               c.    Inhabited structures. A commercial wind energy conversion system shall be set back from the nearest inhabited building, power line or communication line, not less than 1.0 times its total height.
            3.    Design standards. A commercial wind energy conversion system shall comply with the design standards set forth for small wind energy conversion systems in this section.
            4.    Permit applications. A commercial wind energy conversion system shall comply with the permit application requirements set forth for small wind energy conversion systems in this section.
            5.    Commercial Wind Energy Conversion Systems shall not be permitted without approval by the Planning Commission .
         H.    Non-use.
            1.    Any small wind energy conversion system, commercial wind energy conversion system or tower which complies with the terms of this section which is not used for two (2) years, excluding repairs, shall be removed within six (6) months most closely following the two (2) year period. Failure to remove the system shall be deemed a violation of this subsection.
            2.    Any small wind energy conversion system or commercial wind energy conversion system which is non-conforming and which is not used for one (1) year, excluding repairs, shall be removed within six (6) months most closely following the one (1) year period. Failure to remove the system shall be deemed a violation of this subsection.
   (g)    Interpretation of Zoning Map. Where the street or lot layout actually on the ground or as recorded differs from the street and lot lines as shown on the Zoning Map, the Board after notice to the owners of the property and after public hearing, shall interpret the Map in such a way as to carry out the intent and purpose of this chapter. In case of any question as to the location of any boundary line between zoning districts, a request for interpretation of the Zoning Map may be made to the Board and a determination shall be made by the Board.
   (h)    Administrative Review; Appeals. The Board shall have the power to hear and decide appeals filed as hereinbefore provided, where it is alleged by the appellant that there is error in any order, requirement, decision, determination, grant or refusal made by the Building Official or other administrative official in the enforcement and/or interpretation of the provisions of this chapter.
   (i)   Variances. The Board shall have the power to authorize variance from the terms, provisions or requirements of this chapter upon appeal in a specific case filed as hereinbefore provided:
      (1)    Where by reason of the size, shape, physical and/or topographic characteristics of the specific parcel of land on the effective date of this chapter, or other extraordinary physical situation or condition of this property or of the land immediately adjoining the property in question, the literal enforcement of the provisions or requirements of this chapter would result in denial of all economic use of the land, or
      (2)    Where a developer of land files an application with the Planning Commission to subdivide, resubdivide or divide a parcel of land and one or more of the lots intended to be created thereby do not meet the requirements of the chapter and, by reason of unique physical conditions relative to this specific property, a literal enforcement of the provisions or requirements of this chapter will be physically impossible or economically destructive of all economic use of the land.
   (j)    Conditions in Granting a Variance.
      (1)    In authorizing a variance, the Board may attach thereto such conditions regarding the location, character and other features of the proposed structure or use as it may deem necessary in the interest of the furtherance of the purposes of the chapter and in the public interest. In authorizing a variance with attached conditions, the Board shall require such evidence, guarantee, bond, surety or other security as it may deem necessary to enforce compliance with the conditions attached to such variance.
      (2)    The variance granted shall be in direct response to the unique problem presented. That is, a problem in application of side yards shall be met with variance of side yard requirements, not by variance in permitted land use.
      (3)    The variance granted shall be the least variance required to respond to the problem.
      (4)    The variance granted shall not be a substantial detriment to adjacent property or impair the purposes of this chapter or the public interest.
   (k)   Certifications in Variance. Upon granting a variance under one of the two conditions specified in subsection (i) hereof, the Board shall certify to the Zoning Inspector and to the Planning Commission:
      (1)    That the conditions of either subsection (i)(1) or (2) hereof permitting the granting of the variance, have been met.
      (2)    The manner in which the conditions specified in subsection (j)(2) to (4) hereof have been met, and
      (3)    The special conditions of the variance, if any, as authorized in subsection (j)(1) hereof.
   (l)    Board May Reverse Orders. In exercising its power, the Board may in conformity with the provisions of statute and of this chapter, reverse or affirm wholly or partly, or may modify the order, requirement, decision or determination appealed from, and may make such order, requirement, decision or determination as ought to be made, and to that end shall have all the powers of the office from whom the appeal is taken.
(Ord. 2021-36. Passed 10-26-21.)