1303.07 SUBMISSION OF PLANS TO BUILDING INSPECTOR.
   (a)   Before final construction drawings are prepared by the architect, the architect or owner shall file in duplicate, with the Building Inspector, preliminary plans and elevations for the tentative approval of the design, pursuant to Chapter 1309 of this Code, not less than ten (10) working days before the next meeting of the Architectural Board of Review or, when applicable, the Planning and Zoning Commission. Preliminary plans and elevations received after the deadline will be heard at the next meeting subsequent to the meeting for which the deadline was set unless the Chairman of the Board or Commission, for good cause, waives the deadline.
   (b)   The owner or his or her agent shall file, in triplicate, with the Building Inspector, a permit application, plans, elevations, specifications and other information required for approval and the issuance of a building permit.
(Ord. 2010-121. Passed 8-10-10.)