1141.03 INSTALLATION OR BOND REQUIRED.
   Prior to the granting of final approval, the subdivider shall have installed, or shall have furnished adequate bond for the ultimate installation of, in accordance with the standards of the Public Utilities Commission of Ohio, the following:
(a)    Underground communication cables.
(b)    Underground distribution cables for power and street lighting from a common distribution system and the equipment and housing necessary in the operation of the distribution system.
(c)    Adequate provision for street light lamps and standards in accordance with a design approved by Council.
      (Ord. 1988-121. Passed 11-22-88.)