1385.09 BALANCING AND ADJUSTING.
   (a)    After completion of the installation, the heating and air conditioning systems shall be prepared for operation and placed in operation in accordance with the manufacturer's instructions. The refrigerant system and hydronic system shall be fully charged and filled with required fluids.
   (b)    The equipment and controls shall be fully checked and proper operation verified. Controls shall be calibrated.
   (c)    Air and water systems shall be balanced to provide the fluid distribution required for uniform comfort conditions.
   (d)    Fan speeds, pump operation, damper and balancing valves shall be adjusted as required for proper system balance, and all balancing items shall be secured in place.
   (e)    Equipment shall be adjusted such that no electrical component will operate in an overloaded condition.
(Ord. 1992-101. Passed 1-14-92.)