(A) Schedule of system development fees for availability by meter size in inches:
Wastewater System Development Fees and Effective Dates One-Time Fee by Meter Size in Inches | |||||
Meter Size | January 1, 2018 | January 1, 2019 | January 1, 2020 | January 1, 2021 | January 1, 2022 |
Wastewater System Development Fees and Effective Dates One-Time Fee by Meter Size in Inches | |||||
Meter Size | January 1, 2018 | January 1, 2019 | January 1, 2020 | January 1, 2021 | January 1, 2022 |
5/8"-3/4" | $1,900 | $2,120 | $2,340 | $2,560 | $2,780 |
1" | 4,750 | 5,300 | 5,850 | 6,400 | 6,950 |
1½" | 10,830 | 12,084 | 13,338 | 14,592 | 15,846 |
2" | 19,000 | 21,200 | 23,400 | 25,600 | 27,800 |
3" | 43,700 | 48,760 | 53,820 | 58,880 | 63,940 |
4" | 76,000 | 84,800 | 93,600 | 102,400 | 111,200 |
6" | 172,900 | 192,920 | 212,940 | 232,960 | 252,980 |
(B) Schedule of fees for residential reconnection. In the event that a sewer tap is present and a user desires to reestablish a connection to the Wastewater system, the user shall pay the reconnection fee of $50 plus applicable inspection fees. This is only applicable where a lot had an existing building.
(C) Wastewater Tap Inspection Fee:
User Class:
| Fee Per Inspection:
|
Residential | $35 |
Commercial/Industrial | $140 |
(Ord. 21-C-17, passed 11-28-17)