§ 5. WASTEWATER SYSTEM DEVELOPMENT FEE AND EFFECTIVE DATES.
   (A)   Schedule of system development fees for availability by meter size in inches:
Wastewater System Development Fees and Effective Dates
One-Time Fee by Meter Size in Inches
Meter Size
January 1, 2018
January 1, 2019
January 1, 2020
January 1, 2021
January 1, 2022
Wastewater System Development Fees and Effective Dates
One-Time Fee by Meter Size in Inches
Meter Size
January 1, 2018
January 1, 2019
January 1, 2020
January 1, 2021
January 1, 2022
5/8"-3/4"
$1,900
$2,120
$2,340
$2,560
$2,780
1"
4,750
5,300
5,850
6,400
6,950
1½"
10,830
12,084
13,338
14,592
15,846
2"
19,000
21,200
23,400
25,600
27,800
3"
43,700
48,760
53,820
58,880
63,940
4"
76,000
84,800
93,600
102,400
111,200
6"
172,900
192,920
212,940
232,960
252,980
 
   (B)   Schedule of fees for residential reconnection. In the event that a sewer tap is present and a user desires to reestablish a connection to the Wastewater system, the user shall pay the reconnection fee of $50 plus applicable inspection fees. This is only applicable where a lot had an existing building.
   (C)   Wastewater Tap Inspection Fee:
 
User Class:
Fee Per Inspection:
Residential
$35
Commercial/Industrial
$140
 
(Ord. 21-C-17, passed 11-28-17)