The Storm Water Pollution Prevention Plan and Abbreviated Storm Water Pollution Plan review, filing, and inspection fee is part of a complete submittal and is required to be submitted to the City and the Summit SWCD as part of the review process. Please contact the City Engineer for the current fee schedule.
(a) Construction activities have started at the site with no SWP3 completed.
(b) Failure to install sedimentbasin(s) when the SWP3 and/or site drainage clearly indicate as a first step (within 7 days prior to grading and within 7 days of grubbing.)
(c) Failure to implement any sediment/erosion controls; or
(d) Dewatering activities resulting in turbid discharges.
(Ord. 18-91. Passed 8-14-18; Ord. 23-91. Passed 9-5-23.)