880.01 PERMIT REQUIRED; FEE.
   The removal of topsoil or loam for commercial purposes or otherwise from any lands within the Municipality is hereby prohibited unless the owner of property from which topsoil or loam is to be removed first obtains a written permit from the Manager authorizing such removal. No person shall remove topsoil or loam from any construction site for the erection, construction or alteration of buildings or the installation of sidewalks or driveways without first obtaining a written permit from the Manager authorizing such removal in accordance with this chapter. The fee for such permit shall be five dollars ($5.00).