16.40.030 Construction requirements.
   A.   All construction requirements shall conform to the applicable sections of the Standard Specifications for Road and Bridge Construction, Department of Transportation.
   B.   The developer shall take necessary precautions to prevent sediments and debris from entering existing storm sewers. If, during construction, sediments and debris are allowed to enter the existing storm sewers as a result of the failure of the developer to take the necessary preventative action, he shall be required to clean and remove the sediments and debris from the sewers.
   C.   Existing field tile encountered during construction shall be connected to the new storm sewer system where possible. If it is not possible to connect the field tile to the new sewer system the existing field tile shall be routed to lie within utility easements or within the public right-of-way.
   D.   The developer shall incorporate acceptable erosion control management during construction of the development. This shall include both temporary and permanent steps intended to prevent erosion and to protect downstream landowners.
(Ord. 81-10 § 9.1 (C), 1980).