§ 153.06 FEE SCHEDULE.
   As set by resolution of the governing body from time to time based on prevailing costs, the fee schedule for proceeding under this chapter shall follow this format.
Function Performed
Fee
Function Performed
Fee
Extension of period of tentative approval of preliminary plat
 
(a)   Where no modification, changes or deviations from original preliminary plat
 
(b)   Where there are modifications, changes, or deviations from original preliminary plat
$
 
 
_________% of original fee
 
 
_________% of original fee
Fees for engineering, review, and inspection of construction:
 
a.   Engineering review fees: for administrative and engineering expenses of processing and reviewing improvement plans required under § 153.56(C) shall be accompanied with payment by the proprietor of a fee in accordance with the following schedule as applicable:
 
(i)   Street and lot drainage and sidewalk plans:
 
      (A)   Checking street plans, including checking grades, protection of slopes and street drainage and prevent ponding areas
 
      (B)   Checking lot drainage plans. Includes checking of lot grading plans to provide adequate drainage and prevent ponding areas
 
   (ii)   Storm sewer plans. Checking plant, examination, and approval of design plans to assure adequate storm drainage facility and checking surrounding areas and drainage districts to prevent flooding on to or from adjoining areas
 
   (iii)   Water system plans, checking plans. Examination and approval of design plans, including checking of proper gate valve controls and hydrant coverage
 
   (iv)   Street Paving: To be paid by contractor to Municipal Engineer at rate of $_______ per inspector per crew day, with the street paving contract, including an estimated amount for such purpose, subject to adjustment based on actual requirements
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
$_______ lot
 
 
 
 
 
$_______ lot
 
 
 
$_______ lot
 
 
 
 
$_______ lot
   (ii)   Storm sewer inspection of installation. This item shall include checking of grades, sewer construction, and appurtenances
 
   Estimated Construction Cost:
 
   $0 to $5,000
   $5,000 to $50,000
   $50,000 to $100,000
   Over $100,000
 
   (iii)   Sanitary sewers: inspection of installation of sanitary sewers. This item to include checking of grades, sewer construction, and appurtenances:
 
   $0 to $5,000
   $5,000 to $50,000
   $50,000 to $100,000
   Over $100,000
 
b.   Construction inspection fees. For inspecting construction improvements. Inspection of construction of utilities, drainage facilities, and pavement will be performed by the Municipal Engineer and paid for by the proprietor. The estimated cost of improvements shall be furnished by the proprietor, including a tabulation of quantities and unit prices. This estimate is subject to approval of the Municipal Engineer. Five days prior to commencing construction, the proprietor shall deposit with the Clerk-Treasurer the estimated inspection fee, based on the following schedule:
 
   (i)   Inspection of subdivision grading. Check subdivision grading to determine general conformance to plan and prevention of ponding, immediately after road subgrade approval
 
   (ii)   Storm sewer inspection of installation. This item shall include checking of grades, sewer construction, and appurtenances
 
   Estimated Construction Cost:
 
   $0 to $5,000
   $5,000 to $50,000
   $50,000 to $100,000
   Over $100,000
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
$_______ lot
 
 
 
 
 
$
 
___% but not less than $
___% but not less than $
___% but not less than $
 
 
$
 
___% but not less than $
___% but not less than $
___% but not less than $
 
 
   (iii)   Sanitary sewers: inspection of installation of sanitary sewers. This item to include checking of grades, sewer construction, and appurtenances:
 
   $0 to $5,000
   $5,000 to $50,000
   $50,000 to $100,000
   Over $100,000
 
 
 
$
 
___% but not less than $
___% but not less than $
___% but not less than $
 
 
 
 
$
 
___% but not less than $
___% but not less than $
___% but not less than $
Filing and recording fee required by statute
$__________
Final approval of preliminary plat
$______ per lot, with $_______ minimum
Final plat approval (see also “fees for engineering” above)
$______ per lot, with $_______ minimum
Partitioning or division of lots, pursuant to § 153.07
$_____ per new lot or
$____ per ______ acre, whichever is greater
Pre-preliminary plan review
$______per lot, with $_______ minimum
Tentative approval of preliminary plat
$ ______ per lot, with $_______ minimum
 
(1984 Code, § 6-02-06-010) (Ord. 11, passed 8-26-1969)