§ 51.06  INSPECTIONS.
   (A)   Required prior to occupancy. No water shall be delivered to any structure hereafter built within the city or within areas served by city water until the same has been inspected for possible cross- connections and been approved as being free of same by the Department of Public Works. The Building Inspector shall not issue an occupancy permit without the Department of Public Works’ inspection having been completed. Upon completion of such inspection by the Department of Public Works, notification will be given to the Building Inspector.
   (B)   Periodic inspections. Inspection shall be made periodically by the city of all buildings, structures or improvements of any nature receiving water through the city system for the purpose of ascertaining whether cross-connections exist.
(Ord. 05-18-15, passed 5-18-2015)  Penalty, see § 51.99