13.85.050: MINIMUM REQUIREMENTS FOR A CONDOMINIUM PROJECT:
   A.   Each condominium conversion project shall comply either with the current land use codes, or with a finding of nonconformance acceptable to the city as per section 13.88.040 of this title.
   B.   Each condominium conversion project shall meet the following for minimum utility requirements:
      1.   All condominium units within a development shall be separately metered for gas, electricity, and water. Meter(s) shall be installed in accordance with the requirements of this code and utility provider's standards.
      2.   Each unit shall be provided with readily accessible individual shutoff valves or switches for water, gas, and electrical services.
      3.   Each condominium unit shall be equipped with its own heating and cooling system.
   C.   Prior to final approval, the city shall cause final inspections of all buildings and structures and work therein to be made upon request of the developer to determine conformance with the current applicable building codes.
   D.   In the event the city, upon preliminary examination, finds violations of such building codes these violations must be corrected prior to final approval with all repairs or renovations proposed by the developer.
   E.   The property condition report shall be recorded with the subdivision plat as a method of disclosure to any potential owner within the project.
   F.   As a condition of final approval, the developer shall be required to sign an agreement with the city of Holladay that indemnifies and holds the city harmless in the authorization of the condominium conversion. (Ord. 2012-15, 9-20-2012)