9-9-4: WORK SITE PRECAUTIONS:
Special precautions for site work shall include the following:
   A.   If, at any stage of the grading work, Village representatives determine by inspection that the nature of the operation is such that further work as previously authorized (by permit) is likely to imperil any property, public way, watercourse or drainage structure, the Village may require, as a condition to allow the work to be done, that such reasonable safety precautions be taken as deemed appropriate to avoid the likelihood of such peril. "Special precautions" may include, but shall not be limited to, specifying a more level exposed slope, construction of additional drainage facilities, berms, terracing, compaction, or other erosion control measures, testing, investigations and submittal of reports.
   B.   Where it appears that stormwater damage has or may result because erosion control measures are not complete, work may be stopped and the contractor (or permittee) required to install temporary or permanent planting or structures, or take such other measures as may be required to protect adjoining property or the public safety. The Village may specify the date of start and completion of grading, or may require that earthwork operations be conducted in specific stages so as to ensure completion of protective measures or devices prior to the advent of seasonal weather conditions. (Ord. 19-05, 6-4-2019)