9-2-25: FOUNDATION LOCATION AND ELEVATION SPOT SURVEY:
Immediately after the foundation has been poured and prior to scheduling a backfill inspection, the owner or contractor shall submit to the building official three (3) copies of an on-site (spot survey) location of the structure showing the top of foundation elevation. The survey shall be reviewed by the Village Engineer. (Ord. 19-05, 6-4-2019)