§ 150.064 REQUIREMENTS.
   All utility lines being installed shall be inspected by the plumbing inspector before the line is covered. Such lines shall be 24 inches below surface level. Each separate violation of this section constitutes a separate offense.
(Prior Code, § 5-505) (Ord. 1084, passed 9-11-1984; Ord. 1097, passed 11-14-1989) Penalty, see § 150.999
Cross-reference:
   Tunneling under streets for utility crossings, see § 96.32