9-13-5: EXEMPTIONS:
Projects that in the determination of the village engineer do not alter an existing grade, contour or drainage flow shall not be subject to the permit requirements of this chapter, including, but not limited to, the following:
   A.   Raised decks; and
   B.   Open fences. (Ord. O2008-46, 8-12-2008)