Where it becomes necessary for storm water detention, or retention, or systems designed to control, channel, or route storm or surface water, to cross private property, an easement as outlined in the Storm Water Design Manual will be obtained. Such easement will be a minimum of twenty (20) feet and be reviewed and approved by the Village Engineer.
(Ord. 19-20. Passed 11-4-20.)