Within the Hebron Village limits all buildings and other uses requiring water will connect to the Hebron Water System.
(a) Installation. The user will be responsible for installing the service tap. The Water System Superintendent, and/or the Village Engineer will inspect the installed tap. Installation plans, materials, and related appurtenances will be approved before installation begins.
(b) Tap Fee. Before approval of the Construction Plan or beginning an installation, the developer/user will pay all tap fees and capacity charges.
(c) Tap Size. The Water System Superintendent or Village Engineer will review tap size and the required materials.
(Ord. 19-20. Passed 11-4-20.)