The construction plans of all new, relocated, or altered water supply lines and related appurtenances will be approved by the appropriate Utilities Superintendent and the Village Engineer prior to the approval of the final plat. The Village Fire Chief will approve all new, relocated, or altered fire municipal fire protection supply systems prior to the approval of the final plat.
(a) Valves. Valves will be placed outside of the pavement wherever practical. In general, two valves will be installed at every main line, tee, and three valves will be placed at every main line cross. The maximum distance between main line valves will be one-thousand (1000) feet.
(b) Meters. Meters will be supplies by Hebron and paid for by the developer or user.
(c) EPA. The developer will provide the Village with all required Ohio EPA approvals and pay all Ohio EPA review fees.
(Ord. 19-20. Passed 11-4-20.)