In addition to the required performance bond, the Village Engineer may require a restoration bond. Said bond will be to insure repair of any damage done to existing curb, gutter, sidewalk, driveways, street pavement, landscaping, or other items within the right-of-way adjacent to a subdivision, and damages as a result of a poorly executed erosion and sedimentation control plan. The amount of said bond will be as determined by the Village Engineer based on his estimate of potential damage. Restoration bonds will be released when all damaged facilities, if applicable, have been restored to the satisfaction of the Village Engineer.
(Ord. 19-20. Passed 11-4-20.)