1109.06 FINAL SITE PLAN.
      Final Site Plans submitted in accordance with this chapter shall adhere to the following requirements and contain the following information:
   (a)    Items Common to All Plans.
      (1)    Plan sheets shall be a minimum of 24 inches by 36 inches mylar material.
            (2)    North arrow, horizontal scale, and vertical scale (engineering scales only).
            (3)    Engineering design firm name, address, and telephone number.
            (4)    Phasing lines (or future phasing lines) with description.
            (5)    Proposed and existing rights-of-way and easements.
            (6)    Distinct separation between proposed and existing elements of the plan.
            (7)    Centerline and edges of pavement of all abutting streets.
            (8)    Street names, municipal corporate boundaries, and site boundaries.
           (9)    Identification of adjacent parcels, property lines, and property owners.
            (10)    Building and parking setbacks and no build zones.
            (11)    100 year floodplain elevation, along with firm panel number and date.
   (b)    Cover Sheet.
           (1)    Project name, address, and location map.
            (2)    Index of sheets and benchmark list (referenced to NAWD 88 datum).
            (3)    Index map at a 1" = 200' scale showing adjoining properties, owners, streets, bearing and distance of the project boundaries, and general site layout.
            (4)    Summary of quantities containing at minimum water services length and size; sidewalk and bike path within right-of-way and public easements, driveway pavement, street trees, sanitary services length and size.
            (5)    Signature lines for the Mayor, Village Administrator, Village Engineer, Fire Chief and Community Development Coordinator.
            (6)    Drawing block with revision dates, project title and code table.
   (c)    Site Dimension Plan.
            (1)    Paved surfaces, curbs, landscape islands, mounding limits, and street tree locations.
            (2)    Parking spaces, drive aisles, driveways and radii, sidewalks and bike paths.
           (3)    Edges of existing and proposed street pavement.
            (4)    Handicap access and parking.
            (5)    Impermeable surface area.
            (6)    Interior landscaping area of parking lot.
            (7)    Signage for traffic flow control.
   (d)    Site Utility Plan. 
           (1)    All existing and proposed utilities.
            (2)    Size, slope, and type of proposed and existing utility services and mains.
            (3)    Existing and proposed storm sewers in dashed lines.
            (4)    Invert and tap elevations of sanitary services.
           (5)    Proposed pad and finished floor elevations.
           (6)    Provisions to comply with Hebron's Pretreatment Program.
   (e)    Site Grading Plan.
           (1)    Existing contours hatched or dashed.
           (2)    Proposed elevations.
            (3)    Benchmark elevations, designations and locations.
            (4)    Storm sewer and sanitary sewer top of casting & invert elevations.
            (5)    Proposed landscape mounding contours.
            (6)    Major flood routing.
            (7)    Ponding limits, elevation, and provisions to detain or retain surface water runoff, along with water quality requirements.
           (8)    Ditch direction of flow and slope.
           (9)    Size, type, and slope of existing and proposed storm sewers.
            (10)    Ponding tabulations.
            (11)    Orifice plate details.
            (12)    Critical year storm.
            (13)    Proposed pad and finished floor elevations. (100 year flood level: 1st floor shall be in accordance with the Village of Hebron Flood Damage Reduction Plan, Ordinance 04-07.
            (14)    Driveway slope(s) from building lines to right-of-way lines (not to exceed 10%).
            (15)     Head wall standards identification.
            (16)    Typical cross-section of parking lot pavement, sidewalks, and curbs.
            (17)    Cross-sections of ditches in right-of-way (at 50 foot spacing).
   (f)    Site Erosion and Sedimentation Plan.
           (1)    Inlet protection locations, silt fence locations, and ditch check locations.
      (2)    Erosion control standards details including during construction.
      (3)    Construction entrance location and detail (if applicable).
      (4)    Tree preservation and location of all trees (if applicable).
      (5)    Major flood routing.
   (g)    Elevation Plan.
      (1)    Building elevations depicting actual composition and architectural style for all proposed structures.
      (2)    Number of floors, floor area, height and location of each building, and proposed general use for each building.
      (3)    In a multi-family residential building, the number, size, and type of dwelling units shall be shown.
      (4)    Exterior lighting, showing location, size, and height of all lights including provisions for the elimination of glare to adjoining properties.
      (5)    Maximum height requirement.
      (6)    Landscape design plan, to include signage and building numbers.
         (Ord. 19-20. Passed 11-4-20.)