§ 53.17 SEWER MAINS AND SERVICE LINES; MINIMUM STANDARDS.
   Any new, replacement or extension to any sewer main or service line connected to the sanitary sewer distribution system of the city shall be equal to or exceed the minimum specifications of Schedule 40. Sewer mains or service lines, including a tracer line, must be laid in sand.
(Prior Code, § 3-217) (Ord. 435, passed 2-12-1985)