158.12 EROSION CONTROL.
   Rock berms, silt fences, sedimentation basins, stabilized construction entrances/exits and similar recognized techniques shall be employed during and after construction to prevent point source sedimentation loading of downstream facilities. Such installations shall comply with current TCEQ requirements. Additional measures may be required during and after construction if during subsequent runoff events erosion or sediment damage is documented as a violation of TCEQ Regulations or city ordinance by city staff.
(Ord. 2007-18, passed 6-26-07)