(A) The secondary plat will not be considered for approval until the action taken by the Commission on the required primary plat has been completed, nor shall secondary approval be granted prior to the expiration of the appeal period provided for in I.C. 36-7-4-707(c). When the secondary plat submitted does not substantially conform to the approved primary plat, the subdivider shall not file an application for secondary plat approval until the primary plat has been amended in accordance with the same procedure required for Primary Plat Approval.
(B) Construction drawings are to be submitted for major subdivisions with the secondary plat. The construction drawings shall include, but not be limited to, the following:
(1) All drainage with invert and top of casting elevations, sizes, length of pipe, drainage profile, existing and proposed tile, drains, culverts, bridges, appropriate high and low water elevations of lakes and streams, and all wooded areas;
(2) Street information, including right-of-way width, type of material to be used, cross-sections, slope of pavement, all stationing, curve data, street profiles, curbs and gutters, and location and description of street signs;
(3) All information required by the county sewage and drainage regulations;
(4) Topography with a minimum contour interval of two feet and site-grading plan for the entire subdivision;
(5) The title, name, address, signature, and registration number of the professional engineer and/or surveyor, and the date, including revision dates;
(6) The postal address for each lot. The applicant shall provide a typewritten list of lot numbers as shown on the secondary plat with corresponding mailing addresses organized by street;
(7) Plan must comply with all the requirements under Chapter 154 Stormwater Drainage, Erosion and Sediment Control Regulations.
(8) The supplemental data sheet shall include the flood zone statement including FIRM map number and date.
(’86 Code, § 7.1-29) (Ord. 1993-9G, passed 9-27-93; Am. Ord. 1994-10C, passed 10-3-94; Am. Ord. 1995-10C, passed 10-16-95; Am. Ord. 2015-10E, passed 10-20-15)