§ 154.504 EASEMENT REQUIREMENTS.
   All stormwater quality management systems, including detention or retention basins, filter strips, pocket wetlands, in-line filters, infiltration systems, conveyance systems, structures and appurtenances located outside of the right-of-way shall be incorporated into permanent easements. For the purposes of access, monitoring, inspection, and general maintenance activities, the petition should include a 30-foot wide drainage easement beyond the actual footprint of the stormwater quality management facility as well as a 30-foot wide access easement from a public right-of-way to each BMP.
(Ord. 2005-12C, passed 12-12-05; Am. Ord. 2018-11-A, passed 12-5-18; Am. Ord. 2022-10A, passed 10-4-22)