§ 51.119 CONSTRUCTION REQUIREMENTS.
   The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the properly enacted rules and regulations of the sanitary district. In the absence of code provisions or in application thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
(Prior Code, § 51.104) (Ord. 4290, passed 12-27-1976) Penalty, see § 51.999