§ 50.34 DISCONNECTION OF METER FOR TESTING.
   Whenever a request shall be made to inspect any meter which is installed in any premises, the Sealer of Weights and Measures shall have the right, upon giving the notices provided for in § 50.32, to require the gas company owning the meter to disconnect and detach the meter and convey the meter to any place he or she may direct for the purpose of making his or her inspection, the gas company shall install another meter in place of the one so removed for inspection and test.
(Prior Code, § 50.19)