§ 4-295 STREETS AND ALLEYS.
   (A)   (1)   No well shall be drilled, and no permit shall be issued for any well to be drilled, at any location which is within any of the streets or alleys of the city.
      (2)   No street or alley shall be blocked or encumbered or closed in any drilling or production operation, except with the written approval of the City Manager or his or her designee, and then only temporarily.
   (B)   The permittee shall construct a concrete drive approach to city standards outlined herein, with proper curbs where applicable, within 60 days after production casing has been run.
(Ord. 2991, passed 7-19-94)