(A) Traffic control plans. A permittee shall submit a traffic control plan application to the town at least two business days prior to the proposed start date of construction activities. The traffic control plan application must include a traffic control plan designed and signed by a certified member of the American Traffic Safety Services Association (ATSSA). No work in the public right-of-way shall commence until the Town Manager has approved the traffic control plan.
(B) Traffic Control Manual. The town hereby declares the Phoenix Barricade Manual (2017 Edition) as a public record, three copies of which are to be retained by the Town Clerk's office, and hereby adopts the Phoenix Barricade Manual (2017 Edition) as the town's official traffic control manual for construction work zones with the following revisions:
(1) Arrowboards are required for all lane closures on arterial streets.
(2) Lane closures on arterial streets are not permitted between 5:20 a.m. and 8:30 a.m. or between 3:30 p.m. and 7:00 p.m. unless previously approved by the Town Manager.
(3) A permittee shall hire a uniformed off-duty police officer to be present when construction activities take place within 300 feet of a signalized intersection or if required by the engineer. Permittees shall arrange for a police officer at least five calendar days in advance of planned construction activities.
(Ord. O2019.02, passed 11-14-2019)