§ 113.085 METHODS AND MATERIALS OF STREET REPAIR.
   The town shall have the right to specify the methods and materials of street repair or restoration, together with the horizontal and vertical location of any underground facility proposed by licensee within any public property or right-of-way. The town shall also have the right to control and regulate the work of the licensee to assure a minimum of inconvenience to the traveling public and to impose traffic control requirements, as specified in the town’s subdivision regulations and the town code. The licensee will be required to obtain permits from the town, allowing the licensee to work in the public right-of-way.
(Ord. 2003-07, passed 9-25-2003)