(A) The sewer connection fee to be charged by the town is established in accordance with the following schedule:
Sewer Connection Fee
| |
User Classification
|
Fee
|
Sewer Connection Fee
| |
User Classification
|
Fee
|
Detached unit: | |
Detached dwelling unit per unit, including mobile manufactured homes | $750 |
Townhouses, per unit | $750 |
Condominiums, multi-family dwellings, and recreational vehicles, per unit | $750 |
Commercial/industrial user: | |
Water meter size inches | |
5/8 | $750 |
3/4 | $1,090 |
1 | $1,730 |
1-1/2 | $3,385 |
2 | $5,285 |
3 | $10,435 |
4 | $17,305 |
6 | $34, 070 |
(B) (1) The fee imposed by this subchapter shall be collected by the Building Department, who shall be charged with the administration of this subchapter.
(2) The fee for each dwelling unit or, in the case of commercial and industrial construction, the fee for connection shall be collected by the Building Safety Director prior to the issuance of a building permit, and the fee with respect to any mobile home or recreation vehicle space shall be collected prior to the issuance of a construction permit for the development of a mobile home or recreation vehicle park. The Building Safety Director shall not issue a building permit or construction permit until the fees required by this subchapter have been paid.
(C) Any separate water meter installed for irrigation purposes only will not be included in the calculation of the sewer development fee. In addition, no sewer development fee will be collected for the installation of fire lines, provided such line is not served by a water meter.
(D) All revenue received from the sewer development fee shall be deposited in a utility revenue account to be used for capital expansion and enlargement of the town sewer system and/or for the retirement of debt service, both principal and interest, related to sewer system development.
(Ord. 89-07, passed 8-24-1989; Ord. O2020.13, passed 4-23-2020; Ord. O2020.19, passed 4-23-2020)