The Standards of this section apply to all solar panel energy conversion systems that are accessory to a principal structure.
(a) Location Without Conditional Use: Panels must be attached to a building. Panels must be installed parallel to the roof slope and project no more than twelve (12) inches from the roof surface.
(Ord. 19-011. Passed 4-22-19.)