(a) No work shall be done on any part of the building or structure beyond the point indicated in each successive inspection without first obtaining the written approval of the Building Inspector. Such written approval shall be given only after an inspection has been made by each successive step in the construction as indicated by each of the inspections required in Section 1307.05.
(b) There shall be a final inspection and approval on all buildings when completed and ready for occupancy.
(Ord. C45-66. Passed 7-11-66.)