(A) After the approval of the stormwater management permit by the City of Greensburg and the commencement of construction activities, the City of Greensburg has the authority to conduct inspections of the work being done to ensure full compliance with the provisions of this section, the approved Stormwater Pollution Prevention Plan, the City of Greensburg Stormwater Technical Standards Manual, and the terms and conditions of the approved permit.
(B) Stormwater quality facilities shall be maintained in good condition, in accordance with the operation and maintenance procedures and schedules listed in the City of Greensburg Stormwater Technical Standards Manual, in addition to the designed and approved performance specifications for the facilities and shall not be subsequently altered, revised, or replaced except as approved by the City of Greensburg.
(C) Details regarding the required stormwater BMP Maintenance Agreement, O&M Maintenance Manual, and a Maintenance Escrow account and their transfer to other parties or subsequent owners prior to release of the maintenance bond discussed in §§ 52.090 through 52.099 is provided in the City of Greensburg Stormwater Technical Standards Manual.
(D) The City of Greensburg also has the authority to perform long-term, post-construction inspection of all public or privately owned stormwater quality facilities. The inspection will cover physical conditions, available water quality storage capacity and the operational condition of key facility elements. Noted deficiencies and required corrective action will be included in an inspection report.
(Ord. 2023-15 passed 9-12-23)