§ 51.221 BASELINE MONITORING REPORTS.
   (A)   Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 C.F.R. § 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the Wastewater Utility Manager a report which contains the information listed in division (B) below. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the Wastewater Utility Manager a report which contains the information listed in division (B) below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.
   (B)   Users described above shall submit the information set forth below:
      (1)   Identify information. The name and address of the facility, including the name of the operator and owner;
      (2)   Environmental permits. A list of any environmental control permits held by or for the facility;
      (3)   Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes;
      (4)   Flow management. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 C.F.R. § 403.6(e);
      (5)   Measurement of pollutants.
         (a)   The categorical pretreatment standards applicable to each regulated process.
         (b)   The results of sampling and analysis identifying the nature, concentration, and mass, where required by the standard or by the Wastewater Utility Manager, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. The samples shall be representative of daily operations and shall be analyzed in accordance with procedures set out in § 51.231.
         (c)   Sampling and measurement of pollutants must be performed in accordance with procedures set out in § 51.231, the applicable pretreatment permit, 327 IAC 5-2, 40 C.F.R. part 136, and other applicable state and federal rules, laws, and regulations.
      (6)   Certification. A statement, reviewed by the user’s authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M), additional pretreatment, or a combination of these remedies is required to meet the pretreatment standards and requirements;
      (7)   Compliance schedule. If additional pretreatment or O&M will be required to meet the pretreatment standards, the user shall follow the schedule established by the Wastewater Utility Manager within which to provide such additional pretreatment or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in § 51.223 and applicable state and federal rules, laws, and regulations; and
      (8)   Signature and certification. All baseline monitoring reports must be signed and certified in accordance with this section and applicable state and federal rules, laws, and regulations.
(Ord. 2008-38, passed 12-10-2008; Ord. 2019-25, passed on 5-13-2020)